The daily power-cut status changed as Wind Power changed the schedules for one day. Wind power showed how undependable it is, as two days of wind, and then a lull starved the grid almost immediately.
 |
Sun 4 Mar 2012 - Sat 10 Mar 2012 (Thanjavur, TN, India) |
|
Wind power in this part of the Indian peninsula has been undependable.
Even monsoon winds have not been predicted with sufficient accuracy,
hence usage of wind during non-monsoonal periods for energy would be the
last possible resort and subject to randomness as we have not yet
modeled it.