
The two main sources of electricity generated in Tamil Nadu are
Mettur Hydel Project and thermal plants at the
Neyveli Lignite Corporation.
In addition there are multiple thermal power plants of much lower capacity, some operating on diesel, some operating on coal - all of which have little or no indigenous supply of fuel.
Kalpakkam, the first Fast Breeder Reactor (FBR) powers areas in the state capital of Chennai and has already been upgraded close to 1.25 MW peak capacity with an additional reactor. This was designed to be a contingency and research operation to support state capitals in times of grave emergency. Our complete reliance on Kalpakkam for Chennai (and surrounding areas) is already stressing out the production from this plant.
Wind power generation has dropped 85% between 2012 and 2013. This is from 30% of projected peak wind power capacity to 5% of projected wind power plant capacity.
Kudankulam's
revised nuclear power technology reactor output is sketchy at best, one can assume that it feeds 500MW (peak: 750MW) of power into the grid if it is operational - despite the fact that it's capacity is much higher. This is more a naval facility than a civilian power production plant, particularly due to its location and is manned by very few civilians.
Read on to see data, alternatives, and where we must try to go from here ...